The data sheet gives a starting point, not a setting. Every job moves it: hose length, outside air, the substrate, the day's humidity. Start here, spray a test patch, and adjust.
Starting settings
| Thermoseal HFO and 5G (closed cell) | Thermoseal 500 (open cell) | |
|---|---|---|
| Primary heater, initial | 110 to 120°F | 129°F |
| Hose, initial | 110 to 120°F | 129°F |
| Processing pressure | 1,200 to 1,450 psi | 1,200 psi |
| Drum temperature | warm gradually to 77°F; do not recirculate | recirculate at 77 to 90°F |
| Mix ratio | 1 to 1 by volume | 1 to 1 by volume |
| Substrate and air | above 45°F summer grade, above 14°F winter grade | above 32°F |
| Substrate moisture | under 18 percent (concrete under 10) | under 18 percent (concrete under 10) |
| Dew point | substrate at least 10°F above | substrate at least 10°F above |
The rig has to be able to hold a consistent 1 to 1 ratio and reach at least 1,200 psi. If it cannot, the problem is the rig, not the settings.
Before the first trigger pull
- Drums at temperature. 77°F is the number. A cold drum is thick, pumps short and throws the ratio off at the first stroke. Closed cell is warmed in the drum, not recirculated; the HFO blowing agent does not like being pumped around.
- Heater and hose at the set point and holding. Watch the hose reading at the gun end, not the display at the machine. A long hose in cold air loses heat; on a cold day run the hose at the top of the range and keep it off the ground.
- Pressures matched. A and B gauges within a close band of each other. A gap that grows while you spray is a restriction on one side: a screen, a chamber port, a check valve or a drum running empty.
- Substrate checked. Temperature with an infrared gun, moisture with a meter on wood, and the dew point from the weather. Frost, dust, oil and rust come off first.
- Test patch. One square foot on a scrap of the same substrate. Watch the rise, the cream time and the surface before committing to a wall.
Reading the foam and adjusting
| What the foam does | Likely cause | Adjust |
|---|---|---|
| Rises slowly, dense, poor yield | Material too cold at the gun, substrate cold | Raise heater and hose within range; warm the substrate; check drum temperature |
| Scorched, dark core, strong smell, surface cracks as it cools | Too hot, or lift too thick, or winter grade in the heat | Lower heat; thinner lifts; switch grade |
| Rough surface, pattern breaks up, "popcorn" | Pressure low for the chamber, or material cold | Raise pressure within range; check heat; check chamber size matches the rig output |
| Spits, pulses, crossover at the gun | Chamber or side seals worn, pressures unbalanced | Service the gun; find the restriction |
| Glassy, brittle, crumbles | ISO-rich: B-side restricted or short | Stop. Check B screen, pump, drum level |
| Soft, spongy, slow to cure, fishy smell | Resin-rich: A-side restricted or short | Stop. Check A screen, pump, drum level |
Change one thing at a time. Ten degrees of heat or 100 psi is a step; then spray another patch.
Cold-weather setup
- Winter grade on the closed cell, and still warm drums; the grade handles the wall, not the drum.
- Run heater and hose at the top of the range and insulate the hose where it crosses open ground.
- Heat the space ahead of the crew where it is possible; the substrate warms slower than the air.
- Spray the sun side of the building in the afternoon and the shaded side after it has had the morning to come up.
The data sheets say it plainly: the applicator manufactures the foam on site and is responsible for observing it and adjusting. The settings above are where that starts.