The grade is the B-side. The A-side drum of ISO is the same; the winter B-side carries a heavier catalyst load so the foam reacts hot and fast on a cold wall. The summer B-side is dialed back so the foam has time to rise before it sets in a hot attic. Spray the wrong one and the foam tells you the next morning.
The temperatures on the data sheets
| Product | Grade | Substrate and air temperature | Also required |
|---|---|---|---|
| Thermoseal HFO (closed cell, 2 lb) | Summer | above 45°F | substrate 10°F above dew point |
| Thermoseal HFO (closed cell, 2 lb) | Winter | above 14°F | substrate 10°F above dew point |
| Thermoseal 5G (closed cell, commercial) | Summer / Winter | above 45°F / above 14°F | substrate 10°F above dew point |
| Thermoseal 500 (open cell, 0.5 lb) | One grade | above 32°F | substrate 10°F above dew point |
| Thermoseal 800 (open cell, 0.75 lb) | One grade | above 32°F | substrate 10°F above dew point |
Those are substrate temperatures. The air in the building at 10 am is not the wall. A metal building or a slab that sat at 20°F overnight is still a 20°F substrate at 7 am even when the heater says 50.
When to switch
Switch when the substrate you will spray that day will be under about 45°F for closed cell. In practice:
- Fall: the first week the overnight low stays under 40°F, winter grade goes on the truck. Keep summer grade for daytime attics that are still hot.
- Spring: go back to summer grade when the morning substrate is reliably above 45°F and attics are climbing past 90°F.
- Shoulder months: carry both. The job decides, not the month. A crawlspace in March is a winter-grade job; the attic above it on the same afternoon may be a summer-grade job.
- Open cell: no switch to make. Below 32°F at the substrate, wait, heat the space, or spray closed cell.
The dew point rule applies all year: the substrate must be at least 10°F above the dew point, or the foam goes down on a film of moisture and the bond is gone.
What goes wrong with the wrong grade
| Mistake | What you see | Why |
|---|---|---|
| Summer grade on a cold substrate | Slow rise, dense foam, shrink-back or pulling off the studs by morning | Not enough catalyst for the cold; the reaction stalls and the foam cures stressed |
| Winter grade in the heat | Dark or burnt core, strong smell, rough surface, cracking as it cools | Too much catalyst for the heat; the lift cooks |
| Either grade on a wet or frosty wall | Blisters, poor adhesion, foam that peels in sheets | Moisture in the reaction and no bond to the substrate |
Drum temperature is a separate question
The grade handles the wall. The drums still have to be warm. Thermoseal HFO drums are brought gradually to 77°F before spraying and are not recirculated; Thermoseal 500 recirculates at 77 to 90°F. A winter-grade set sprayed from 40°F drums is still a cold set. The drum storage guide covers warming safely.
How to order it
The winter and summer sets are separate items in the catalog, named Summer Version and Winter Version. Stock at each branch shows on the product page and on the branch page, so a crew can check before driving over. Both versions are priced at the same account rate.
Quick answers
Sources
- Thermoseal HFO technical data sheet, V2.0, September 22, 2026
- Thermoseal 5G technical data sheet, V2.0, September 22, 2026
- Thermoseal 500 technical data sheet, V2.7, January 10, 2025
- Thermoseal 800 technical data sheet, V2.8, September 22, 2026
- USAFoam training, SPF Fundamentals: what changes between summer and winter B-sides